Amazon Web Services AWS re:Invent / re:Play – The Bridge

A large logistical feat of the AWS re:Play event was creating the means for proper crowd flow. With 17,000 expected attendees at a location with no direct accessibility, we knew that a short and smooth entry into the party would be critical, and as such, we built a bridge directly from the Sands Expo Hall into the Linq Highroller parking lot. Using the worlds largest single piece hydraulic crane, we assembled the bridge over the course of 3 days and lifted it over a monorail and into place securely.